Hyundai Accent

Repair and car operation



Hyundai Accent
+ 1. The maintenance instruction
+ 2. The engine
+ 3. Greasing system
+ 4. Cooling system
+ 5. The control, toxicity decrease
+ 6. Fuel system
+ 7. Ignition system
+ 8. Coupling
+ 9. A transmission
- 10. Axes and power shafts
   10.1. Specifications
   10.2. A power shaft
   10.3. A power shaft with SHRUS ball and Birfield type
   10.4. A power shaft with SHRUS Birfield and трипоидного type
   10.5. A rotary fist and a nave of a forward wheel
   10.6. A back axis
   10.7. Search and elimination of malfunctions
+ 11. A suspension bracket
+ 12. A steering
+ 13. Brake system
+ 14. A body
+ 15. A central air
+ 16. The electric equipment
+ 17. The appendix
+ 18. Electroschemes




10.6. A back axis

1 – a bolt, 50–60 Н•м;
2 – an additional arm;
3 – draught of the stabilizer;
4 – a nut, 35–45 Н•м;
5 – a nut, 75–90 Н•м;
6 – the longitudinal lever;
7 – a nut *, 130–150 Н•м;
8 – a nave support;
9 – the back brake mechanism;
10 – a nave with the bearing;
11 – a brake drum;
12 – a nut, 180–220 Н•м;
13 – the lever ();
14 – the lever ();
15 – a nut *, 130–150 Н•м.

The prevention

* Nuts which are necessary for tightening temporarily are specified, and a definitive tightening to spend after car installation on wheels.


Removal

PERFORMANCE ORDER
1. Remove a back wheel.
2. Remove a brake drum.
3. Remove the gauge of frequency of rotation.
4. Disconnect a brake hose from a rack of a back suspension bracket.
5. Unbend a fillet and turn away a nut of fastening of a nave of a back wheel.
6. Remove a nave of a back wheel with the bearing.


The prevention

Needlessly the bearing not to remove from a nave of a back wheel.



Check


PERFORMANCE ORDER
1. Check up the bearing of a nave of a back wheel on absence of deterioration and damages.
2. Check up a rotor of the gauge of frequency of rotation of a back wheel on absence выкрашивания teeths.
3. Check up a nave on absence of cracks and deterioration.
4. Check up a nave support on absence of cracks.

Assemblage

PERFORMANCE ORDER
1. Screw a new nut with a fillet and hammer in a nut fillet into a nave groove.
2. Establish a nave cap.