1. Before separation of elements of a central air of air it is necessary to prepare tools and adaptations for system service so that to leave separated system elements on as smaller time is possible. |
2. At separation of components of a central air of air immediately close connections by corresponding covers for an exception of hit of a moisture in system. |
3. All spare elements and tubes of a central air of air should be stored in tight packing. |
4. Repeatedly do not bend earlier formed tubes. |
5. All tools, a coolant distributing a collector, measuring devices and tubes should be stored in a dry and pure place. |